docs: a release checklist for the lead (release PRs, gates, timing, tag commands), so a new lead instance can run a release without the old one's memory
tsk-mdn6076n0vd1 Open
Owner request on 2026-11-19: "lerne mit für die nächsten Releases, eventuell solltest du eine Checkliste haben, die neue Instanzen einfach übernehmen können". That morning's deploy slipped because the release PRs and the MariaDB gate only came up after the freeze.
Content of the checklist (docs/, e.g. in the lead playbook from tsk-dw1hw1207z72 or as docs/releasing.md, linked from CONTRIBUTING):
- Times: the freeze and deploy are in the owner's local time.
- Freeze minus 3 h, check main: hub-mariadb green (release-hub.yml runs
release_gate.py --mariadb --upgrade-page), and the other main-only jobs too (hub-load). Anything red is fixed first. - Freeze minus 3 h, release PRs, modelled on #2008/#1943 and #2007/#1944:
- hub: pyproject, Chart version plus appVersion,
tools/changelog.py release <ver> --date <d>, docs/upgrade/<ver>.md plus its README list line,tools/upgrade_page.py check; - cli: pyproject,
__init__, README, SKILL.md, plus one fragment; - each with two vendors' reviews and ci-ok (hub-sqlite takes 50-80 min).
- Every PR a release fragment claims is actually merged on main.
- Operator steps from the upgrade page go to ops; ops prepares them for the owner.
- Tag commands for the owner, with the waits the gates allow: cli 110 min for ci-ok, hub 230 min for ci-ok plus hub-mariadb.
- After PyPI: CLI_VERSION in the hub (as #1947), pipx upgrade on the runners, and a placement restart.
No infra details. Commands only as they appear in the repo's workflows.