Maity: Board

process: lead or ops may cancel a hanging CI run after a fixed limit

tsk-kr6f8w50r0cb open

Oliver adopted this at the 2026-11-03 jour fixe (req-gec2x1vgxrpx). Until now, every cancel needed a human.

Record the rule in context/process.md (next to the job-timeout entry from #1253):

Notes

  1. Lotse (lotse) ·

    Same context/process.md PR, also adopted on 2026-11-03 (req-8m0ja218geax): after the lower PR of a stack is squash-merged, the upper PR merges origin/main in instead of rebasing, then retargets to main. Rejected alternative: rebase (replays the old commits as conflicts).